Approvals run in parallel with design
Our engineers prepare calculations and coordinated MEP drawings, submit them to the authorities and landlord, respond to comments and follow the process through to final inspection. Because submissions start during design, approvals rarely hold up the site.
Design deliverables
- Heat-load, electrical-load, lighting and water-demand calculations
- HVAC, electrical, lighting, plumbing, drainage, fire and ELV layouts
- Schematics and single-line diagrams
- Coordinated services drawings and sections
- Equipment schedules and specifications
- Authority and landlord submission sets
- As-built drawings and O&M documentation
Why clients choose Inspace
One contract, one accountable team
Design, approvals, civil, MEP, joinery and finishes are delivered under a single contract, with one project manager as your point of contact.
Approved by demanding developers
Our vendor approvals with Aldar, Emaar, DAMAC, Mubadala, UAE University and Tarweed mean our documentation, safety and quality systems have already been tested.
Our own joinery workshop
Counters, display units, panelling and furniture are made in our Ajman facility, so we control quality and lead times instead of waiting on a third party.
Certified systems
We work to ISO 9001:2015 quality management and ISO 45001:2018 occupational health and safety standards on every site.
Approvals handled for you
We prepare and submit drawings to the municipality, free zone, Civil Defence, utilities and landlord, and follow them through to the completion certificate.
Transparent pricing
Itemised BOQ quotations with clear inclusions and exclusions, so the final account matches the price you approved.
Frequently asked questions
How long do MEP approvals take?
It varies by authority, landlord and project type. Typical fit-out approvals take two to six weeks; we plan submissions early so they run alongside design and procurement.